Charming Family House with Garden and Garage in Neunkirchen
Around 2620 Neunkirchen- 81 m²
- 3 Rooms
- 2 Baths
More details
About this house
Charming single-family house with garden in Neunkirchen – renovation project with potential!
In a quiet and at the same time well-connected residential area of Neunkirchen this 1954-built single-family house comes to market on a plot of around 450 m². The property is characterized by a pleasantly sheltered garden area and a variety of design possibilities for buyers who want to modernize and develop a house according to their own ideas.
The house presents itself in a well-maintained, but renovation-needing condition and offers a usable floor area of around 125 m², of which about 82 m² is living space. The property is currently heated by a gas central heating system; alternatively there is the possibility to heat with a wood/coal stove. The house is laid out as follows:
Kg
- Parlor
- Workshop
- Boiler room
- Storage room
- Bathroom
Eg
- Entrance area
- WC
- Living room
- Kitchen
- Room
Dg
- Anteroom
- Bedroom
- Bathroom
A special highlight of the property is the roughly 350 m² garden, which is entered via a lovingly designed front yard. The existing thuja hedge provides pleasant privacy and creates a private, protected atmosphere. In the garden there is also already a concrete slab for a portable pool – ideal for relaxed summer days in your own home.
Behind the house there is a roughly 15 m² garage that offers space for a car. The outdoor area is complemented by numerous forged iron elements that can be found across the entire property. They come from the former owner, who worked as a locksmith, and give the house a unique, handcrafted touch.
From the entrance area you reach the central stairwell as well as the living areas on the ground floor. Here there is a WC, a living room, a separate kitchen and another room. The generously proportioned living room faces west and is supplied with plenty of natural light through a corner window. The kitchen and dining area orient toward the garden and courtyard; here there is the possibility, through redesign, to create a modern open-plan kitchen and to add an exit via a terrace to the garden afterwards.
The expanded attic comprises an anteroom, a spacious bedroom and a bathroom. This is directly accessible from the bedroom and equipped with a bathtub, toilet and sink. The area is ideal as a private retreat with a pleasant living atmosphere.
In the basement there is a former parlor with a self-made wine storage, a workshop with a workbench, the heating room, a storage room and another bathroom with a shower. In particular the workshop points to the crafts history of the house and offers versatile usage possibilities – for hobby, storage or craft activities.
If you are interested, do not hesitate to call to arrange a viewing appointment!
Additional costs:
Land register entry: 1,1% d.KP.
Real estate transfer tax: 3,5% d.KP.
Brokerage fee: 3% d.KP. + 20% USt.
Purchase contract fee: approx. 1,2% plus cash outlays and USt.
Infrastructure / Distances
- Health
- Doctor <500m
- Pharmacy <500m
- Hospital <1.500m
- Kinder & Schools
- School <1.000m
- Kindergarten <1.000m
- Local amenities
- Supermarket <500m
- Bakery <1.000m
- Shopping center <1.000m
- Other
- Bank <1.000m
- ATM <1.000m
- Post office <1.500m
- Police <1.000m
- Traffic
- Bus <500m
- Train station <1.500m
- Motorway access <3.500m
Distances are as the crow flies / Source: OpenStreetMap
Around 2620
Neunkirchen
Key information
Amenities
- Garage
- Elevator
- Bathtub
- Shower
- Storage
Total purchase price
About your broker
A second look
Ask Daniel directly
Daniel knows this place inside out!
Daniel usually responds within a few hours.