Penthouse at Zimmermannplatz with 3 bedrooms and 3 terraces
Around 1090 Wien- 136 m²
- 4 Rooms
- 2 Baths
More details
About this apartment
Perfectly renovated and newly built condominiums in a revitalized corner property near St. Anna Children's Hospital
The revitalization of a beautiful Gründerzeit building on Zimmermannplatz is just beginning. 9 period apartments of various sizes and orientations and 2 attic levels with a total of 6 additional apartments are waiting for their new owners.
Everything is just right here: the central location, the optimal floor plans, and the sustainable renovation! Creating contemporary living space while preserving the historic heritage of the Gründerzeit building is perfectly balanced here.
The project:
With a total usable area of 1.940 m², 6 new attic apartments will be created, each on a single level, as well as 9 period apartments and a commercial space.
The entrance and façade:
The entrance to the building and access to the elevator will be barrier-free, the façade will be revitalized, and the windows will be fitted with multiple insulation. The roof will be completely rebuilt and will blend beautifully into the ensemble. A bicycle room with step-free access makes life easier for cyclists.
The period apartments:
Because the property is on a corner, the period apartments face two to three different directions and offer unobstructed views. From the street-facing apartments, you have a long-distance view toward Zimmermannplatz, while on the garden side you can look across the landscaped garden into another large courtyard.
The location is highly sought-after: situated in a very popular, established residential area of Vienna's 9th district, away from the tourist crowds and very well connected to public transport. The AKH-Michelbeuern subway station is just 300 m or a 3-minute walk away. Local shopping options are also excellent.
The attic apartments:
4 apartments will be built on the 1st attic level and 2 apartments on the 2nd attic level. The major advantage is that all 6 apartments are built on a single level and are therefore also barrier-free within the apartment.
The technology:
Sustainability is truly a priority in this building: the building, including the basement areas, will be upgraded for energy efficiency, and central heating and cooling will be provided by an air-source heat pump, which will be installed discreetly on the roof.
A new elevator will be installed, allowing step-free access to the apartments.
Construction and completion:
Financing for the project is secured, and construction work has already begun. The period apartments will be completed by the 2nd quarter of 2027, by which time the main construction work in the attic will also have been finalized. Completion work in the attic is scheduled for the 1st quarter of 2028.
The owner of the project is United Group of Companies, a family-run group of companies based in Malta, whose history dates back to the year 1926.
Notice pursuant to the Energy Performance Certificate Submission Act: The owner or seller has not yet provided an energy performance certificate, despite having been informed by us of the general obligation to provide one and having been requested to prepare it. Therefore, at least an overall energy efficiency level corresponding to the age and type of the building is deemed agreed. We accept no guarantee or liability whatsoever for the actual energy efficiency of the property offered.
Around 1090
Wien
Key information
Amenities
- Elevator
- Bathtub
- Shower
- Storage
- Wheelchair accessible
Total purchase price
About your broker
A second look
Ask Elisabeth directly
Elisabeth knows this place inside out!
Elisabeth usually responds within a few hours.