Otto-Preminger-Straße, 1030 Wien
Owner occupied Urban Home Village im Dritten Baufeld 13 Completion 2027
Otto-Preminger-Straße, 1030 Wien913,000€
8,256€/m²
- 110 m²
- 5 Rooms
- 2 Baths
More details
Last updated on 08/19/2026
4 views
New build · Constructed in 2027
First occupancy
Located on the 2nd floor
About this apartment
Living in the Village im Dritten
In Vienna's 3rd district, the Village im Dritten is creating a new piece of city – one of the largest urban development areas in Vienna. Across more than eleven hectares, ARE Austrian Real Estate, together with the City of Vienna and the wohnfonds_wien, is developing a lively, almost car-free quarter with around 2,000 apartments, office and commercial spaces, childcare, educational facilities and daily necessities.
The green heart is formed by the Bert-Brecht-Park – an oasis for relaxation, encounter and play. All roofs that are not publicly accessible will be greened. Sharing offers, shopping opportunities and gastronomy lie right on the doorstep. Sustainability, short distances and a high quality of life are the guiding principles of this new neighborhood.
With the slogan “urban daheim” this idea is embodied by Baufeld 13 in a special way: modern architecture, versatile open spaces, hobby rooms and community areas – living in the heart of Vienna with a strong urban identity and high comfort.
The ARE is one of the largest real estate companies in Austria and has already realized some of Vienna's most influential building projects – including the renovation of the historic Palais Epstein on the Ring and the iconic TrIIIple Tower on the Danube Canal. The Village im Dritten also fits into this line of innovative projects.
Energy for the future.
Across the entire Village im Dritten, a modern energy network ensures that the individual buildings are connected and energy flows are efficiently controlled. Also, Baufeld 13 is part of this innovative network – one of the most modern forms of sustainable neighborhood supply.
- Ground probes in combination with heat pumps provide energy for space heating in winter and for tempering (ground cooling) in summer.
- Photovoltaic installations on the roof generate renewable electricity.
- Underfloor heating on the ground floor and component activation in the upper floors (via the floor slab above) ensure a balanced room climate.
- Pendellüftungen with heat recovery ensure continuous fresh air supply.
- District heating connection supports supply in peak times as well as hot water production.
- OPS 12 Stg. 1+2: five upper floors
- OPS 12 Stg. 3: eight upper floors
- HGP 5: ten upper floors
- a free space room with movable perforated metal elements for privacy and shading
- a covered balcony with glass railing
- Atrium courtyards bring light and air into the building interior
- Brick façade with glazed balconies – high quality, modern and distinctive
- Vertical greening, greened accessways and planted courtyards create a feel-good outdoor atmosphere.
- Bicycle garage with level access from the street
- Upgraded material concept: parquet, design tiles
- Several selectable equipment packages (“Bundles”)
- Floor-to-ceiling wood-aluminum windows - for bright rooms, external solar shading
- Balconies as extra rooms with movable perforated metal elements
- Skylights in bathrooms of attic apartments
- Door heights of about 2.20 m
- Concealed fittings in bathrooms & showers
- Generous bathtubs and barrier-free showers, electric towel dryer
- Security: entry doors WK3, ground-level accessible windows as anti-break-in RC2n with alarm system provisions, video intercom
- Decentralized living space ventilation with heat recovery
- Additionally purchasable hobby rooms (from ca. 15 to ca. 40 m²)
- purchasable parking spaces for e-bikes with lockable boxes and cargo bike spaces
- 143 condominiums
- 2 commercial spaces
- 10 hobby rooms (optional to acquire)
- 92 underground parking spaces (access via BP 14A; with lockable socket also suitable for charging)
- 338 bicycle parking spaces, 3 spaces for cargo bikes and 6 lockable bicycle boxes with charging function – additionally purchasable
- Party room, community room, Kidszone, youth playground, laundromat
- Predominantly generous open spaces
- Directly on the roughly 2-hectare Bert-Brecht-Park – nature and recreation on your doorstep
- Tram: line 18 (Wildgansplatz, 2 minutes), line 71 (St. Marx, 3 minutes)
- S-Bahn: St. Marx station (2 minutes), Belvedere Quarter (15 minutes)
- U-Bahn: U3 Schlachthausgasse (15 minutes), U1 Hauptbahnhof (15 minutes)
- New tram line 18: by autumn 2026 direct connection from Schlachthausgasse (U3) to U2
- Stadium – enabling a new direct connection into the green Prater
- Hauptbahnhof Wien: 7 minutes by tram
- City Stephansplatz: about 20 minutes reachable
- Autobahn A23, interchange Landstraßer Gürtel / St. Marx: 3 minutes
- Vienna Airport: about 30 minutes by car or rapid transit
- Shopping and dining spaces in the quarter, including in the Docks
- Various shopping options in Rennweg Center, in “The Mall” Wien Mitte and at the Hauptbahnhof
- Cultural highlights: Belvedere, Botanical Garden, City Park, Hundertwasser House, Neu Marx
- Event hall
- Relaxation within walking distance: Schweizergarten, Donaukanal, Prater
Around 1030
Wien
Loading map
Key information
Rooms
5 rooms · 2 baths · 2 toilets
Size
110,6 m² living area
Energy details
Available
Amenities
- Underground parking
- Storage
- 24,2m²Balcony × 2
Total purchase price
913,000€
8,256€/m²
About your broker
A second look
Floor plan
Documents
- Planmappe6.96MB · PDFPlanmappe6.96MB · PDF
- Dokument 11.13MB · PDFDokument 11.13MB · PDF
- Dokument 2121KB · PDFDokument 2121KB · PDF
Ask Susanne directly
Susanne knows this place inside out!
Susanne usually responds within a few hours.