Bürogebäude Siemensstraße
Around 1210 Wien- 480 m²
More details
About this office
For rent are generously sized to small office spaces located in the "Gebäude 33" of the property Siemensstraße 92. The entire property is developed with the "Gebäude 35" as well as the "Gebäude 33". In the outdoor area around the building there are parking spaces for customers and staff.
The object to be leased is located on the operating premises of the headquarters of Siemens AG Österreich. The "Gebäude 33" was erected in 1980 with a basement, a ground floor and six upper floors. In the basement there are storage rooms and on the upper floors the office spaces. The building has three entrances and seven stairwells with a total of four passenger lifts.
The main entrance is on the northeast side, is accessible for people with disabilities and has in front of it an accessible parking space. Access through the main entrance is via two revolving doors including adjacent swing doors for escape purposes and a disabled access. In the basement there is a loading ramp with a scissor lift, an electronically secured person-by-person access control system and an electronically secured supplier access door. A level access via the basement from "Gebäude 33" is possible via a side-lowered, paved open area.
Building equipment The partition walls were constructed with gypsum plasterboard. The floors in the corridor and office areas are fitted with carpet and partly with parquet flooring and in the tea kitchens with PVC flooring. The corridor areas in the building core are equipped with terrazzo flooring, the sanitary areas are tiled. The room height in the offices and corridors is 2,70 m. The corridors, sanitary areas and ancillary rooms (such as cloakroom, tea kitchens etc.) are equipped with a supply ventilation. The supply air openings are located in the floor and the exhaust openings were installed in the ceiling. The building is heated with district heating. The regulation of the heating, the supply ventilation, the access control etc. is controlled via the building management system. The cabling for IT lies in the raised floor and is implemented with CAT 6 cabling. The fiber optic supply is provided by various providers in the basement.
Around 1210
Wien
Key information
Amenities
- Elevator
Total monthly cost
About your broker
A second look
Ask Andreas directly
Andreas knows this place inside out!
Andreas usually responds within a few hours.