Loft apartment with roof terraces and green inner courtyard environment not needed here? but we must provide single line
Around 1030 Wien- 2.067 m²
More details
About this office
Loop Offices is located in a strategically perfect location between Vienna's city center and the airport. The new urban district around Vienna's main train station is only a few minutes' walk away.
In close proximity at the Arsenal, the TU Wien Science Center is being developed as Vienna's leading technology and innovation campus, with key institutions for research and development in a university setting.
From the office M&S Architekten ZT GmbH, a visionary office building was designed that, by its distinctive appearance as a freestanding icon, captivates and optimally implements the principles of ecological construction — durability, reduction and modularity. The building form ensures an ideal volume-to-surface ratio as well as an unmistakable and widely visible exterior façade.
- Most of the rental areas have their own terraces
- The roofs are designed as extensive green roofs in combination with a PV system
- A green inner courtyard
- A representative lobby
- 121 car parking spaces
- Bicycle parking with showers and changing rooms
- Storage rooms
- Additionally, a multifunctional area in the green basement level provides space for seminars and events
The energy supply is based on heat pump systems using geothermal energy in combination with roof-mounted photovoltaic power production. An additional district heating connection ensures supply security. This allows CO2 emissions to be minimized and lays the groundwork for fully emission-free building operation by 2040.
The sustainability of the building is documented by the ÖGNI / DGNB GOLD- Vorzertifizierung.
The available usable floor area amounts to approximately 14,200 m² in total. A regular floor plate comprises about 2,070 m², with a divisibility starting at about 450 m².
The office spaces are equipped with the latest technology, with tenant-specific fit-out wishes largely accommodated.
Planned construction start: Q1 / 2025. Planned completion: Q4 / 2026.
Visualizations © Squarebytes GmbH. Please note that there is a close business relationship between the broker and the client. The broker acts as a dual agent.
Around 1030
Wien
Key information
Amenities
- Underground parking
- Outdoor parking
- Elevator
- Storage
- Terrace
Total monthly cost
About your broker
A second look
Ask Alexandra directly
Alexandra knows this place inside out!
Alexandra usually responds within a few hours.