Penthouse with 32 m² sun terrace Parkview Linz
Around 4030 Linz- 75 m²
- 3 Rooms
- 1 Bath
More details
About this apartment
- Modern air-to-water heat pump system for heating and hot water
- Cooling via underfloor heating in summer
- Photovoltaic system on the roof to reduce operating costs
- Triple-glazed plastic-aluminum windows for sound and heat protection
- Only 9 exclusive units in a private residential building
- Optimal connectivity: tram & rail within a 2-minute walk
- Motorway connection in close proximity
- Shopping, doctors, schools & childcare directly in the surroundings (SolarCity)
- Brick solid construction for stability & sound insulation
- Sunny, south-facing terrace & balcony areas
- Low-energy construction with heat pump & cooling function
- Photovoltaic system for sustainable operation
- Electric shading systems at all windows
- Video intercom with color monitor
- High-quality bathroom fittings with 60x60 cm porcelain stoneware tiles
- Basement compartment including power connection
- Underground garage with EV charging preparation
- Barrier-free elevator system
- Solid wood parquet floors Landhausdiele or vinyl
- Kunex interior doors with wood door frames (2.1 m height)
- Ceiling height 2.6 m
- Commission-free directly from the developer
KFZ parking spaces:
The stated number of motor vehicle parking spaces is mandatory for each apartment. An additional outdoor parking space can be purchased, depending on availability, for EUR 8,250, and a covered parking space for EUR 24,500.
Environmentally friendly heating in winter and cooling in summer! By using the modern air-to-water heat pump system, environmentally conscious heating including hot water preparation is possible, as well as cooling via the underfloor heating coils on hot summer days.
Functions:
Winter: heating via underfloor heating and hot water preparation
Summer: cooling via the underfloor heating (approximately 3-4 degrees of cooling possible)
Control per apartment via the central control in the living area.
The advantage:
Compared to conventional air conditioning systems, the air is not dried out and there are no additional maintenance tasks such as filter changes required. Through the heat pump principle, the energy costs incurred are only a fraction of those with conventional air conditioning.
Low operating costs:
Due to the heating system in combination with a photovoltaic system, the costs for general electricity and hot water preparation are reduced.
Completion
Planned completion: End of 2027
Infrastructure / Distances
Health
Doctor <1.000m
Pharmacy <1.000m
Clinic <2.500m
Hospital <5.500m
Children & Schools
Kindergarten <1.000m
School <1.500m
University <6.500m
Higher Education <7.500m
Nearby Amenities
Supermarket <1.500m
Bakery <1.500m
Shopping Center <4.000m
Other
Bank <1.000m
ATM <1.000m
Post Office <1.500m
Police <1.500m
Transport
Bus <500m
Tram <500m
Train Station <500m
Motorway access <4.000m
Airport <5.500m
Distance as the crow flies / Source: OpenStreetMap
Around 4030
Linz
Key information
Amenities
- Underground parking
- Elevator
- Bathtub
- Shower
- Storage
Total purchase price
About your broker
A second look
Ask Jan directly
Jan knows this place inside out!
Jan usually responds within a few hours.